Energy

India has historically failed to meet its power sector targets by a significant margin and with tremendous opportunities ahead; the power sector continues to be affected by the shortfall both on generation as well as transmission line. Per capita electricity consumption in India is just 631 units in comparison to World’s average of 2300 units.

Montecarlo is selectively tapping these opportunities to enlarge its presence in distribution segment. With the success of RAPDRP, private participation is on the rise in the transmission and distribution space, with players being awarded under the franchisee route. The losses during power transmission and distribution are projected to come down to about 15% during the 12th Five Year Plan from the present 29%.

Presently the company is spreading its distribution network in the various cities of Madhya Pradesh and is exploring opportunities to adopt the franchisee route under individual or partnership mode. The spectrum of services offering by Montecarlo includes, Design & Construction of High voltage distribution substation, Installation and Re-conductoring of existing lines, Installation of 11kV low voltage overhead lines, distribution transformers as well as feeder renovation works & metering, Urban Area Power Quality improvement Projects and Installation of Transmission towers and EHV transmission lines, Implementation of turnkey solutions of Instrumentation & Control system including PLC/DCS & SCADA System, etc.

List of Major Completed Projects

  • Turnkey based project for HT & LT underground Power Distribution Network in the area of BOL GIDC of Bavla Division

  • Supply of materials, survey, installation, testing and commissioning of 33/11KV S/s. augmentation/additional power transformer in existing 33/11KV S/s, 33KV & 11KV feeders, additional 33KV/11KV bays, replacement of conductor in existing 33KV & 11KV lines, distribution transformer S/s 11/0.433 KV, replacement of bare conductor of existing LT line by AB cable, new LT 3 Phase 4 wire with AB cable, renovation of existing service line & shifting / installation of energy meters for reduction in AT & C Loss and Annual Maintenance (for five year) for Satna & Maihar tons under Lot-XI)

  • Supply of materials, survey, installation, testing and commissioning of 33/11KV S/s. augmentation/additional power transformer in existing 33/11KV S/s, 33KV & 11KV feeders, additional 33KV/11KV bays, replacement of conductor in existing 33KV & 11KV lines, distribution transformer S/s 11/0.433 KV, replacement of bare conductor of existing LT line by AB cable, new LT 3 Phase 4 wire with AB cable, renovation of existing service line & shifting / installation of energy meters for reduction in AT & C Loss and Annual Maintenance (for five year) for Katni town under Lot-XV)

  • Supply of materials, survey, installation, testing and commissioning of 33/11KV S/s. augmentation/additional power transformer in existing 33/11KV S/s, 33KV & 11KV feeders, additional 33KV/11KV bays, replacement of conductor in existing 33KV & 11KV lines, distribution transformer S/s 11/0.433 KV, replacement of bare conductor of existing LT line by AB cable, new LT 3 Phase 4 wire with AB cable, renovation of existing service line & shifting / installation of energy meters for reduction in AT & C Loss and Annual Maintenance (for five year) for Mandla town under Lot-III)

  • Supply of Materials, Design, engineering, Survey, Installation, Testing, and Commissioning of New 33/11 KV S/s, Augmentation of capacity of Power Transformer & Providing addl. Power Tranformer in existing 33/11 Kv S/s with extension of 33 KV & 11 KV Bay along with VCB, Laying of single circuit / Double circuit 33 KV & 11 KV lines (On Bare conductor, HT AB Cable System & HT XLPE Cable), augmentation of conductor of existing 33 KV & 11 KV lines & Renovation works of existing 33/11 KV S/s, Installation of new 63KVA/100KVA Distribution Transformers at identified location along with associated 11KV line (on Bare Conductor & AB Cable System). Providing Fencing, Earthing & Additional Distribution Box on existing 11/0.4KV Distribution Transformers & providing LT Capacitors on existing Distribution Transformers (for HVDC System). Augmentation of LT line conductor & replacement of Bare Conductor of LT line by AB Cable system, New LT 3 phase 4 wire with AB Cable and renovation of existing service line & shifting / installation of energy meter for reduction in AT & C loss and Annual Maintenance (for five year) in Bhopal City under RAPDRP Part-B scheme.

  • Supply of materials, survey, installation, testing and commissioning of 33/11KV S/s. augmentation/additional power transformer in existing 33/11KV S/s, 33KV & 11KV feeders, additional 33KV/11KV bays, replacement of conductor in existing 33KV & 11KV lines, distribution transformer S/s 11/0.433 KV, replacement of bare conductor of existing LT line by AB cable, new LT 3 Phase 4 wire with AB cable, renovation of existing service line & shifting / installation of energy meters for reduction in AT & C Loss and Annual Maintenance (for five year) for Seoni, Balaghat and Malajkhand towns under Lot-XIV)

  • Supply of Materials, Design, engineering, Survey, Installation, Testing, and Commissioning of New 33/11 KV S/s, Augmentation of capacity of Power Transformer & Providing addl. Power Tranformer in existing 33/11 Kv S/s with extension of 33 KV & 11 KV Bay along with VCB, Laying of single circuit / Double circuit 33 KV & 11 KV lines (On Bare conductor, HT AB Cable System & HT XLPE Cable), augmentation of conductor of existing 33 KV & 11 KV lines & Renovation works of existing 33/11 KV S/s, Installation of new 63KVA/100KVA Distribution Transformers at identified location along with associated 11KV line (on Bare Conductor & AB Cable System). Providing Fencing, Earthing & Additional Distribution Box on existing 11/0.4KV Distribution Transformers & providing LT Capacitors on existing Distribution Transformers (for HVDC System). Augmentation of LT line conductor & replacement of Bare Conductor of LT line by AB Cable system, New LT 3 phase 4 wire with AB Cable and renovation of existing service line & shifting / installation of energy meter for reduction in AT & C loss and Annual Maintenance (for five year) in Gwalior City under RAPDRP Part-B scheme.